Revised Building Department Fee Schedule (8/31/22)
TOWN OF HURLEY BUILDING DEPARTMENT FEE SCHEDULE:
Minimum fee for a Building Permit: $50
Review of plans prior to permit application, or for the purpose of revising approved plans: $100/hour
Permit renewal (if permit is expired): 50% of original fee (minimum charge of $50). No charge for renewal if requested at least 5 days prior to expiration date.
Fee for working without a permit:
Residential (1st): $250 plus permit cost
Residential (2nd): $500 plus permit cost
Residential (3rd): $1000 plus permit cost
Commercial (1st): $500 plus permit cost
Commercial (2nd): $1000 plus permit cost
Inspections not normally included with an active Building Permit (ex: property search violations, old expired permit): $100
Inspections requested outside normal business hours: $70 per hour (3-hour minimum)
Re-inspection fee for a failed inspection: $50 residential / $100 commercial
Repairs, alterations, renovations, or installations: $50 for the first thousand dollars of the total project cost, plus $10 for each additional thousand (or any part thereof exceeding $499)
New Construction: $50 plus $.50 per square foot
Demolition: Residential interior--$100
Residential (structure)--$250
Commercial--$500
Blasting: $100 per parcel per day
Fire Safety Inspections: $50 for the first 1000 square feet, plus $.05 for each additional square foot
(Gas stations: $50 plus $10 per pump)
Fire Sprinkler installation: $150
Fireworks Permit: $200 (Allowed by a licensed professional only)
Flood Plain Permit: $200
Fuel Tank Removal/Replacement: Residential--$75 per tank
Commercial (any over 1100 gallons)--$150 per tank
Municipal/Title Search: $150
Operating Permit: $100 (except Short-Term Rental category, which is $250 annually)
Pools: In-ground--$300
Above-ground--$200
Hot Tub--$100
Roofing: Residential--$50 for the first thousand dollars of the total project cost, plus $5 for each additional
thousand (or any part thereof exceeding $499)
Commercial--$50 for the first thousand dollars of the total project cost, plus $10 for each additional
thousand (or any part thereof exceeding $499)
Sign Permit: $50
Solar Permit: $50 for the first thousand dollars of the total project cost, plus $10 for each additional thousand (or any part thereof exceeding $499)
Zoning Verification letter/assessment: $75
(Revised 8/30/22)